|
The cupola went up in sections, which can be seen here. |
|
First it was framed up, and its roof was put on. |
|
Then each wall (which we built out of leftover wall SIPs) was raised up and put
in place. |
|
Each piece went up in a boom lift, which was brought in by the roofer. |
|
Here's another wall being brought up. |
|
And another. |
|
And another. Then the cupola windows went in. |
|
The finished cupola. |
|
A closer view. |
|
It'll look even prettier with siding! |